Finishing up the Siding
With the rough framing inspection completed, I was able to cover the front shear wall with siding. A panel was removed from the house, and a new panel installed to bridge the gap. This will dramatically help tie the garage to the house. No strap was necessary.
I also managed to get the chimney extended. Two 24" sections is all that was needed. I will also fabricate and install braces for the chimney. These will tie the chimney to the garage roof.


