Framing the Front Wall
The front wall doesnt consist of much. But it does include a header that weighs nearly 900 lbs! These walls were framed on the ground, then lifted into place. Hold downs were installed, header dropped into place, framing scabbed in from the header up to the top plate. and then wrapped with Tyvek.
I also had the trusses delivered!
If weather permits, we will be rolling trusses this weekend!




