House Prep Day 2
Today I got back to prepping the house. The existing portion sits on an extended portion of the house stemwall. In order for the garage wall to sit on this stemwall, I had to cut the patio back a bit. Once that was done, I drilled two holes and set two pieces of 5/8 all thread to serve as anchor bolts.
I also trimmed the rest of the eave off, and wrapped the corner of the roof with plastic. Luckily I was watching the weather forecast... Sunday brought quite a bit of rain.



