Laying the block foundation

Day 9!  Finished with the wall!

We got the wall done today, and are ready to pour (grout) the wall.  Inspection is scheduled for Monday, and mud comes Wednesday. 

Setting the final block!

\

Rebar complete, 5/8 all thread in place left and right of the garage door entrance for hold-downs,, and all 5/8 anchor bolts in place.

Holes drilled and horizontal stabs installed to tie the slab to the wall.

And what blocks we have left over.  Roughly 40 blocks.  Not too shabby considering we laid nearly 500!