Laying the block foundation

Day 2!

With a lot of block to lay, even my wife joined in.  Fortunately for me, she is not afraid of real work, and is very good, in fact.  She installed most of the block on the front of the garage.  2 courses installed on the front, 3 on the rear, and from three to one, to 2 on the east wall that has the steps in the footing.

Once we installed all the block we could (up to the first bond beam block) we called for inspection.